The Peacock Springs Connection

The Peacock Springs Connection

In August 2010 James Toland and I made the connection between Peacock Springs and Baptizing Spring. The connection between the two springs means that the Peacock Springs Cave System is now over 10,000ft (3km) longer, adding significantly to its already extensive 28,000ft (8.5km) of passage. I had the honor of tying in to my old line left in downstream Baptizing and thus the two caves were finally connected and made one.
from: http://ezinearticles.com/?The-Peacock-Springs-Connection&id=5395190

... Click to read more

Comments

Popular posts from this blog

1 Bedroom Apartment Rental in South Kensington (LN-450)